Mafoshoro Enterprises (PVT) Ltd
30th July 2010

Onsite at the Sub Station!

Ndizvo Limited (UK) has completed contracts on behalf of Siemens Plc and ABB for Freedom Maintenance who provide maintenance for EDF Energy.

 

 

Floor Support

Stabilising existing flooring.

 

Key roles of the contract:

  • Correct implementation of the Method Statement, Risk assesments and the relevant Health and Safety regulations.
  • Ensuring close monitoring of works in progress and cleanliness of site at all times in case of emergency proceedures.
  • Maintaining a high working standard.
  • Customer satisfaction.

 

Site drawings were updated to show the specific installation of the cross bracing.
WE would welcome the opportunity to work with you and solve some of the problems that you have regardless of location or complexity.
 

 

 

Mid Contract:

 

.

Mid Contract:

Loose tiles were covered to avoid trips and falls and the site cleaned to ensure optimum access.

 

Completion of Contract:


At the completion of the contract the "safe to remove tiles" were marked and notices errected informing persons of safe access areas and the necessary documents passed to key personel.

 

 

Panel Supports:


Panel bases/supports were also built..

 

Job Satisfaction:


" Thanks for the excellent job done in my absence, EDF reported to me that the job was completed to a good standard and on time."